Our client a machine dealer project was to dismantle a CMC Poly bagging system ready for shipment to Germany, our works included mechanical and electrical dismantling of the system, lifting the machine down from a mezzanine floor packing for export, loading and securing the machine to transport including the preparation of the export papers